老子有钱lzyq88(中国)有限公司老子有钱lzyq88官网


Back to the list
Sunway related products successfully passed the State grid prequalification
The number of browse:117The Publishing time:2022-07-29

Recently, Sunway Co., Ltd. received the notice of prequalification results from the State Grid Co., Ltd. The company's "ultra-high voltage cable" and "control cable" and other related products successfully passed the prequalification of the State Grid power transmission and transformation project 2022 annual power transformation equipment.

70abbb94a049ef339f601d23e2b7a80.png

老子有钱lzyq88官网